Refurbishment of Rig Paragon L1112
PROJECT : Refurbishment of Rig Paragon L1112
RIG: Paragon L1112
CLIENT: Paragon Offshore
CLASS/TPI: ABS
LOCATION: Lavgan Dockyard Pvt. Ltd. Ratnagiri, India
Ocean Jetty Hamriyah Free Zone-Phase1, Sharjah UAE
Duration: 14/7/2015 to 7/10/2015
PROJECT DETAILS:
SCOPE:
Steel Replacement – 120 T
- Accommodation Repair
- Removal and replacement of De-Gasser
- Helideck Secondary Escape
- Life Boat Davits – MPI and Load Testing
- MPI and Load testing BOP trolley beams
- Installation of Anode and Bow Leg Light
- Raw Water Manifold Pipeline Renewal
- Stand Pipe & Stand pipe manifold Replacement
- Blasting and Painting Side shell, Wind wall Hull bottom, Main Deck & Side Shall attachment
- Repair in Mud pump room HP manifold
- Fabrication and Installation of Anchor Winch and installation of Fair leads
- Load Testing Certification of Cranes (Port and Starboard)
- Bilge Manifold and Drill water manifold repair in Mud pump room
INSPECTION/TESTING DETAILS
- Visual inspection of all weld joints of primary and secondary application structures.
- Ultrasonic inspection on weld joints of primary and secondary application structures.
- Magnetic particle inspection on weld joints of primary and secondary application structures.
- Pneumatic testing of water tight compartments as per ABS rules.
- Surface NDT and volumetric NDT on cantilever and sub base structures.
Vacuum box testing of full penetration joints on weld joints of primary and secondary application structures