Noble Gene House (NGH)
PROJECT NAME: Modification of King post
RIG: Noble Gene House NGH
CLASSIFICATION: ABS
PROJECT NUMBER: N/A
CLIENT: NOBLE INTERNATIONAL
LOCATION: Hamriaya free zone Sharjah.
DATE: August -2011
PROJECT DETAILS:
- Modification of king post includes removing and fixing of ladders& handrails (1 ¼” GI pipe with 22” Height), Fixing of new platforms, pad eye 2no’s (4.75 Ton).
- Remove and replace new Sheave assy. – 2 set/king post.
- Cut and remove the existing channel section.
- Fix new wooden piece 1 no (size 200mm x 100mm thick X 1200mm long approx.)
- Other related minor fabrication works.
- MPI for all welded joints.
- Painting: painting (grey color) as per noble standard.
- Supply to Noble (Rig NGH) – Hamriyah.
- All welded joints MPI tested and TPI certified