PROJECT NAME: Modification of King post

RIG: Noble Gene House NGH

CLASSIFICATION: ABS

PROJECT NUMBER: N/A

CLIENT: NOBLE INTERNATIONAL

LOCATION: Hamriaya free zone Sharjah.

DATE: August -2011

PROJECT DETAILS:

  1. Modification of king post includes removing and fixing of ladders& handrails (1 ¼” GI pipe with 22” Height), Fixing of new platforms, pad eye 2no’s (4.75 Ton).
  2. Remove and replace new Sheave assy. – 2 set/king post.
  3. Cut and remove the existing channel section.
  4. Fix new wooden piece 1 no (size 200mm x 100mm thick X 1200mm long approx.)
  5. Other related minor fabrication works.
  6. MPI for all welded joints.
  7. Painting: painting (grey color) as per noble standard.
  8. Supply to Noble (Rig NGH) – Hamriyah.
  9. All welded joints MPI tested and TPI certified